Menü Simge
About UsFrom the FounderVision&MissionINJECTION MOLDINGSafety, Health And Environment Policy History

SERDAR PLASTİK, since its establishment in 1973 by the CEO İLHAMİ TÜTEK, has been improving in the field of plastic parts design, mold making, injection molding and assembly, not only in terms of production facilities, but also in terms of technical know-how with its knowledge and experience. 

These capabilities enable us to improve and keep a solid and reliable place in the plastic production industry. 

All staff from the top to the shop floor at SERDAR PLASTİK use their knowledge and experience to satisfy customer expectations in terms of the quality, just-in-time delivery and competitive pricing. 

All business relationships formed with SERDAR PLASTİK are viewed as more than customer – supplier relationships; they are viewed as long-term, reliable and profitable partnerships for both parties. 

Keeping the customer satisfaction at the highest level and continue to improve, is the main responsibility for all of the members of our team. İlhami TÜTEK CEO

Our Vision:
To satisfy the trust of our customers and to become their number 1 preference.

Our Mission:
To provide competitive designs and products to the whole world by combining our near 40 years of know-how and experience by advanced technologies that are respectful to the humanity and the environment.

In order to reach more precise and technical molding parts, experienced and high skilled Serdar Plastik molding department’s engineers and technicians are using fully electrical, hybrid CNC molding machines. Serdar Plastik molding department experts are using advanced Quality and SPC technics to keep the process parameter under control.

All CNC molding machines parameter and limits are properly fixed to keep the product Quality in high level. Production is under control by the help SPC technics either on the machines or by the Quality department

SERDAR PLASTİK is already using 2K-3K (hard-sft, different color, etc.) production technics since 1997.

At Serdar Plastik Industry and Trade Company A.Ş. we believe that all work – related injuries, illnesses and environmental incidents are preventable. We will manage all our activities with concern for people and the environment and will conduct our business without compromising the qualiy of life of present or future generations. Therefore, we will: 

  • Review our management system and performance and continually strive for improvement,

  • Strive to minimize our impact and reduce pollution,

  • Seek ways to use materials and energy in a sustainable manner,

  • Comply with all laws and regulations,

  • Measure our safety, health and environmental performance and seek to be more efficient,

  • Review our management system and performance periodically,

  • Provide the training and equipment necessary to achieve continuous improvement in all aspects of safety, health and environmental performance,

  • Share information on our safety, health and environment performance with our customers and community

 

  • 1973: Establishment of SERDAR PLASTIK in Ata Sanayi (100 m2)
  • 1975: First OEM customer and first export to Italy
  • 1982: Moving to Ostim Industrial Area (600 m2)‏‏
  • 1984: Establishment of Mold Making Department
  • 1985: Changing the local status to Limited Company
  • 1985: Establishment of SERKO for the production of mechanical (store, vertical, jaluzi) curtains
  • 1992: Quality system is established according to ISO9000
  • 1992: Starting to use CAD/CAM systems in mold making
  • 1996: Moving to Sincan Industrial Area E1 (5,000 m2)
  • 1996: Starting to the post operation investments (tampon printing, UW, etc)‏
  • 1996: First High Speed Cutting machine
  • 1998: ISO9000 Certification
  • 1998: Starting to design SERKO products
  • 1999: First 2K stop lens is produced
  • 1999: Starting to sell SERKO products, completely new design and patented for off road vehicles
  • 2003: ISO/TS16949:2002 Certification
  • 2003: Starting to the construction of E2
  • 2004: Starting to invest full electrical injection molding machine
  • 2004: E2 factory has started to work (total area 12,000 m2)
  • 2004: Establishment of MOLDTECH and GROUPTECH
  • 2006: Starting to the construction of E3
  • 2008: E3 factory has started to work (total area 24,000 m2)
  • 2008: Starting the metallization, painting and hard coating processes
  • 2009: Photometric laboratory is established
  • 2010: Lean Production Procedure started to use
  • 2010: ISO1400 & ISO18000 sertification